Back to the mortgage blog

NEW CONSTRUCTION / WASHINGTON HOME LOANS

Construction-to-permanent financing connects the land, plans, builder, budget, draws and finished mortgage into one coordinated approval process.

By , Mortgage Loan Originator, NMLS #2864321 · One Real Mortgage Corp., NMLS #198414 · Published · 4 min read

Learn how single- and two-closing construction-to-permanent financing works and what Washington buyers should verify before building.

Construction financing is not the same as buying a completed home

A construction-to-permanent loan is designed to connect financing for construction with the long-term mortgage on the completed residence. The lender evaluates the borrower and the project: land ownership or acquisition, plans, specifications, builder, contract, budget, permits, appraisal, draw process, contingency and completion timeline. Approval of the borrower alone does not approve the build.

Fannie Mae recognizes single-closing and two-closing construction-to-permanent structures. In a single-closing transaction, construction and permanent financing are documented together under the eligible structure. In a two-closing transaction, interim construction financing and permanent financing involve separate closings and separate legal documents. Availability and terms depend on the actual lender and program.

A borrower should choose the structure only after comparing qualification, closing costs, rate or conversion terms, required equity, payment during construction, draw administration and the risk of changes before completion. A one-close label does not make every cost fixed, and a two-close structure does not guarantee future permanent-loan approval or pricing.

The project package drives the lender's review

Expect to provide a signed construction contract, detailed plans and specifications, itemized budget, draw schedule and builder information. The appraisal is based on the proposed completed home and acceptable supporting information. If the plans, site work or allowances change, value and financing may need to be reevaluated.

The budget should include more than visible finishes. Site preparation, utility connections, well or septic work, engineering, permits, impact or connection charges, driveway, drainage and required inspections can materially affect the total. Rural Washington property may add access, power, water, environmental or geotechnical questions that need answers before the lender can rely on the schedule.

The lender may require a contingency for overruns, but that does not make every upgrade financeable. Decide how change orders will be approved and paid. Upgrading materials during the build without lender approval can exhaust available funds or interfere with the draw plan.

Builder verification and permits matter in Washington

Washington Labor & Industries provides a Verify tool for checking contractor or tradesperson registration and related information. L&I's consumer guidance recommends verifying registration and explains that permits help ensure work is reviewed for applicable codes. Depending on the property and scope, permits and inspections may be handled by a city, county or L&I authority.

A valid registration check is only one part of due diligence. Review references, experience with comparable builds, insurance, bonding information, complaint or citation information available through official tools, contract terms and financial capacity. The mortgage lender may have separate builder-approval requirements and should be involved before the construction contract becomes nonrefundable.

The borrower should know who obtains each permit, who pays each fee and what inspections are required before draws or occupancy. A contract provision cannot eliminate public permit requirements or the lender's completion conditions. Do not start unapproved work in the hope it can be added to the loan later.

Draws, inspections and lien control continue through construction

Construction funds are generally released in stages as work is completed and documented. The lender or its administrator may require inspections, invoices, lien waivers or other evidence before authorizing a draw. The builder's payment schedule should be compatible with the lender's draw process; a mismatch can create avoidable cash pressure.

Fannie Mae's construction-to-permanent guidance states that construction work and related lien claims must be completed, paid and satisfied before the permanent mortgage is delivered under its requirements. That makes recordkeeping important. Keep signed change orders, invoices, draw statements, inspection records, permits, certificates and releases in one organized file.

Delays can affect interest, housing arrangements, lock or conversion terms and document freshness. Weather, utility availability, inspections and materials can all change the schedule. Build a realistic buffer and ask in writing how extensions are handled. No one should promise an exact completion date or future permanent rate without the terms to support that statement.

A pre-contract construction financing checklist

Construction lending is highly file- and project-specific. Cory's team can confirm which structures are available for the borrower, property and builder, but the borrower should not sign a land or construction commitment based only on a general program description.

  • Confirm whether the loan is single-closing or two-closing and what must be reverified before permanent financing.
  • Identify how the lot is owned or purchased and how existing liens or lot equity are treated.
  • Obtain plans, specifications, a detailed budget and a draw schedule that agree with one another.
  • Verify the contractor through Washington's official tool and complete the lender's builder review.
  • Map permits, inspections, utilities, site work, contingency, change orders and completion evidence.
  • Compare total cash requirement, construction-period payment, permanent-loan terms and delay risk.

Questions borrowers ask

What is the difference between a single-close and two-close construction loan?

A single-closing structure combines eligible construction and permanent financing documents, while a two-closing structure uses separate interim and permanent loan closings. Costs, qualification and conversion risk should be compared for the actual lender options.

Can I change the plans after construction starts?

Changes may require builder, permit, appraisal and lender approval and can affect the budget or draw schedule. Obtain approval before committing to a change order.

Official sources reviewed

Program rules and borrower eligibility can change. Your loan team will confirm the requirements that apply to your scenario.

Turn this research into your Washington loan plan.

Share your timing and goal with Cory Williams first, or use the secure lender portal if you are ready for a full application.

Get my plan for this scenario Apply securely